Cloud Migration


Client Challenges

Cloud Migration Becomes More Complex After The First Workloads Go Live

Companies that contact us about cloud migration are often already working with an existing environment or migration plan. The next challenges typically involve dependencies, cost, application changes, or operational constraints.



Service Overview

Areas Of Work Covered In A Solbeg Cloud Migration Engagement

An engagement can cover assessment, architecture, migration, and stabilization, or focus on the part where additional engineering capacity is required. The exact scope is defined after the current environment, dependencies, and workload requirements are understood.

Assessment and migration readiness

Review of infrastructure, applications, databases, storage, integrations, and operational constraints to determine what can move with limited change, what requires modification, and what may be better retained or retired. The output can include a dependency map and a workload-level migration disposition.

Migration strategy and target architecture

Definition of the target environment, network and identity model, connectivity, security baseline, and migration approach for each workload group. This is where cloud migration solutions are matched to individual system constraints rather than applied through one default pattern across the entire estate.

Landing zone and environment setup

Implementation of the target account or subscription structure, networking, identity and access controls, logging, monitoring, and baseline security before production workloads arrive. Infrastructure can be defined as code so environments are reproducible and changes can be reviewed.

Workload and application migration

Migration of compute, application services, configurations, and supporting components in planned waves, including application changes required for the workload to operate correctly in the target environment.

Data and database migration

Transfer of databases, files, and object data using the replication, validation, synchronization, and cutover methods appropriate to each system. The scope can include like-for-like database moves as well as engine or platform changes where required.

Post-migration optimization and support

Cost review, resource right-sizing, performance tuning, monitoring refinement, and operational handover after workloads are running. Our cloud migration services can extend beyond cutover because the stabilization period is when real workload behavior, performance, and cost assumptions can be checked against production usage.


Problem & solution



The problem

Migration decisions span multiple teams and systems

Infrastructure, applications, data, security, and the business processes running on top of them are usually owned by different groups. A workable migration sequence depends on decisions from all of them, but each team evaluates risk from a different perspective. Individual parts of the plan may therefore be approved while the dependencies between them remain unresolved.

The people who understand the existing systems best are also responsible for keeping them running. Asking the same team to document dependencies, redesign target environments, execute migration work, and continue normal product delivery creates a capacity constraint even when the required technical knowledge exists internally.

Cost and performance are also difficult to validate before representative workloads are running in the target environment. Architecture decisions made early in the program can affect later infrastructure spend, licensing, network transfer, and operating effort. Cloud migration consulting services can help validate these assumptions before later migration waves make architecture changes more expensive.

Solbeg's approach

Planning is built around dependencies, ownership, and the downtime the business can actually support

We begin by mapping dependencies across the environment rather than treating each application as an isolated migration unit. The assessment identifies which systems communicate, who owns them, what data moves between them, and which workloads need to migrate together. Migration waves are then designed around those relationships.

Solbeg engineers can take responsibility for the agreed migration scope while the client’s specialists remain involved where business knowledge, access, approvals, and system-specific decisions are required. Where internal engineering capacity is available, responsibilities and handover points are defined before execution begins.

Cost and performance assumptions are established during cloud migration strategy consulting and refined as architecture decisions are made. Resource sizing, storage tiers, transfer paths, licensing implications, and other significant cost drivers can be modeled and then validated against representative workloads during the migration.

Cutover planning begins with the downtime and risk the business can accept. Where a long interruption is not practical, replication, staged migration, synchronization, parallel operation, or other approaches can be considered depending on the workload. Rollback criteria and validation steps are agreed before the cutover begins.


When this service fits

When Companies Bring In Outside Help For A Cloud Migration

External migration support becomes particularly relevant when a program involves fixed deadlines, complex dependencies, operating constraints, or application changes that require coordinated planning and engineering capacity.

A lease expiry, hardware refresh, or hosting deadline creates a migration window that cannot be extended indefinitely. Each workload needs a defined destination, dependencies need to be understood, and migration waves have to fit the remaining schedule. In this situation, a cloud migration partner can provide both the sequencing and the engineering capacity required to execute it.

Two organizations may bring separate environments, identity models, operational practices, and application dependencies. Consolidation decisions need to be made workload by workload, and some systems may require platform or architecture changes rather than a direct move.

Operating systems, databases, virtualization platforms, or other infrastructure components can reach vendor end of support on a fixed schedule. Migration may therefore need to include a version, engine, or architecture change rather than only relocation to a different hosting environment.

Contracts, audit requirements, or expansion into new jurisdictions may introduce data residency, isolation, encryption, logging, or access-control requirements. Those constraints need to be reflected in the target architecture before workloads move.

Infrastructure sized for peak demand may remain underused for much of the year, while infrastructure sized for average demand may struggle during seasonal spikes. Cloud elasticity can help in appropriate cases, but application and data architecture determine how effectively a workload can actually scale.

Some workloads are already in the cloud while others remain in the original environment, creating cross-environment dependencies and duplicated operational processes. Work then starts with assessing what has moved, what should remain, what should be completed, and whether any earlier decisions need to be revised.

Recovery time and recovery point requirements may exceed what the existing infrastructure can deliver without significant investment. Cloud infrastructure can become part of a disaster recovery design, and in some cases the same assessment leads to broader migration of the primary workload.


Scope of Work

Roles And Responsibilities Inside A Migration Engagement

Cloud migration requires infrastructure, data, application, security, QA, and operational work to move in parallel. Team composition depends on the workloads, migration strategy, target environment, and responsibilities retained by the client’s internal team.

Discovery and assessment

Inventory of infrastructure, applications, databases, storage, and integrations, together with dependency mapping and workload disposition. The result provides the current-state view required to plan migration waves and identify major technical and operational risks.


Why Solbeg

What You Get From Running The Migration With Solbeg

A migration is ultimately judged by whether workloads operate correctly after cutover, how predictable the target environment is to run, and how much disruption the transition creates for the business.

The people who plan the migration can stay involved through execution

Assessment, architecture, migration planning, and implementation can remain within the same engineering organization. This reduces the amount of context that has to be transferred between an advisory team and a separate delivery team once migration begins.


Comparison

Rehost First Or Re-Architect During The Move

Migration strategy is normally selected per workload rather than once for the entire estate. Some systems can move with limited changes, while others need architectural work to meet the intended scalability, availability, cost, or operational goals.

Option A
  • Suitable for workloads under a fixed external deadline where leaving the current infrastructure is the immediate priority
  • Can provide a shorter path to migration because substantial application redesign is deferred
  • Requires less architecture and development work before the initial move
  • Cost may remain similar or increase initially if the workload retains the same fixed-capacity behavior
  • Managed services, elasticity, and other cloud-specific capabilities may remain limited until optimization takes place
  • Creates a separate modernization or optimization backlog after the migration
  • Keeps the operating model closer to the existing environment during the first phase

Rehosting can be appropriate when the deadline is fixed, the workload is relatively stable, or the organization cannot combine infrastructure migration and substantial application redesign within the same delivery window.

Option B
  • Suitable for applications already scheduled for significant change or where the current architecture is itself a scalability, availability, or operating constraint
  • Can introduce managed services, elastic scaling, or other target-state capabilities as part of the migration
  • May reduce some operational responsibilities when self-managed components are replaced
  • Requires more design, development, and testing before migration can be completed
  • Expands the validation scope because application behavior changes together with infrastructure
  • Concentrates more technical change within one program and therefore requires careful staging and rollback planning
  • Requires regular product and technical decisions from the client throughout implementation

Re-architecting can be appropriate when the existing application design is one of the reasons for migrating or when postponing the required application changes would simply create another major program shortly afterwards. In practice, cloud migration companies may use both approaches within the same estate, and experienced cloud migration service providers normally select the migration pattern according to the requirements of each workload group.


Engagement Process

Cloud Migration Across Assessment, Cutover, And Stabilization

A migration engagement begins with discovery and planning and continues through production stabilization. The scope of later stages can be refined as dependencies and workload behavior become better understood during assessment and pilot work.

  1. Discovery and assessment

    We inventory infrastructure, applications, data stores, and integrations and map the dependencies between them. Your infrastructure, application, security, and other relevant owners participate in working sessions to confirm technical findings. The result is a documented current state, workload-level disposition, and identified migration risks.

  2. Target architecture and migration plan

    Cloud architects define the target environment, migration approach for each workload group, and the wave sequence, together with relevant cost, performance, security, and availability requirements. This planning stage is an important part of how cloud migration consulting companies differ because migration sequencing can significantly affect later rework and risk.

  3. Landing zone build and pilot migration

    The target environment is implemented with the required networking, identity, security, monitoring, and automation foundations. Where appropriate, a representative workload is migrated or tested first to validate architecture assumptions, tooling, cutover procedures, and cost expectations before larger migration waves begin.

  4. Wave migration and cutover

    Workloads move according to the agreed sequence, with validation, cutover conditions, and rollback criteria defined for each wave. Dependencies between workloads already migrated and those still running in the original environment are managed during the transition.

  5. Stabilization and optimization

    Production performance, infrastructure consumption, monitoring, and operational procedures are reviewed against the expectations established during design. Resources can be right-sized, outstanding issues resolved, and documentation finalized as the environment moves into the agreed operating model, including ongoing Solbeg support where required.


Completed projects

View all projects

Selected projects we’ve delivered

A few examples of digital products we’ve built for our clients and the results they brought to their business.

Telecom

Software Development/Telecom/Web Development

Telecom Billing Platform Optimization

Mobile and web platform for vehicle service and ownership management

View project
insurance

Finance & Banking/Insurance/Mobile Development/Software Development

Insurance Premium Financing Platform for Commercial Insurance Provider

Mobile and web platform for vehicle service and ownership management

View project
Leading Home Renovation Contractor

Real Estate/Web Development

Leading Home Renovation Contractor

Web app for calculating bathroom renovation costs

View project

FAQ

Questions Clients Ask Before Starting A Migration

Replication, parallel operation, staged cutover, and similar techniques can reduce or, in some cases, eliminate user-visible downtime during migration. The appropriate approach depends on the workload’s architecture, consistency requirements, external dependencies, and operational constraints. Expected downtime and the cutover method are defined during assessment and migration design.

No. Migration assessment can result in different decisions for different workloads, including migration, modernization, retention, replacement, or retirement. Licensing, latency, technical dependencies, compliance requirements, operating cost, and remaining application lifecycle can all affect whether moving a particular system is justified.

Resource sizing, storage, transfer, licensing, managed services, and expected utilization can be modeled during architecture design using available workload data. These estimates can then be checked against pilot or early migration workloads. When evaluating a cloud migration company, it is important that the assumptions behind the estimate remain visible because actual production cost depends on workload behavior and architecture after migration.

We need access to the relevant systems and available documentation, together with participation from the people who understand applications, infrastructure, security requirements, operational dependencies, and business-critical constraints. Internal involvement is usually highest during discovery, architecture review, validation, and cutover decisions.

Yes. Work can begin with an assessment of what has already moved, the condition of the target environment, unresolved dependencies, cost and operational issues, and the workloads that remain. The remaining migration sequence can then be revised based on the current state rather than automatically continuing the previous plan.

Look at whether the proposed scope covers only infrastructure or also includes application, data, security, validation, and stabilization work. When comparing cloud migration services companies, it is also useful to understand how cost assumptions are established, how cutover and rollback are planned, which responsibilities remain with your team, and what support exists between go-live and steady-state operation.

The target environment moves into stabilization and normal operation. Documentation, monitoring, runbooks, access procedures, and unresolved follow-up work are maintained as part of the agreed operating model. Solbeg can remain involved during stabilization and continue with optimization, platform development, and ongoing support as the environment evolves.